Local HV Front End
Schematic
Set up
- Plug in thetest fixture to the AC
- Connect the 7-pin white connector to the UUT, BATT connector
- Connect the 8-pin black connector to the UUT, CONTROLLER connector
- Insert the terminal at the end of the white wire connector to the UUT, CHASSIS hole
Procedures
- Step "none":
- Turn the knob on the fixture all the way counter-clockwise
- Note that H4 on the UUT goes On
- Check that the test fixture's LED is off
- Press the button on the fixture
- Check that the LED stays off
- Release the button
- Turn the knob on the fixture all the way counter-clockwise
- Step "SW-":
- Turn the knob 1 step clockwise
- Note that H6 on the UUT goes On
- Check that the test fixture's LED is off
- Press the button on the fixture
- Check that the LED comes on
- Release the button
- Turn the knob 1 step clockwise
- Step "SW+":
- Turn the knob 1 step clockwise
- Note that H7 on the UUT goes On
- Check that the test fixture's LED is off
- Press the button on the fixture
- Check that the LED comes on
- Release the button
- Turn the knob 1 step clockwise
- Step "Pre-Chg":
- Turn the knob 1 step clockwise
- Note that H8 on the UUT goes On
- Check that the test fixture's LED is off
- Press the button on the fixture
- Check that the LED comes on
- Release the button
- Turn the knob 1 step clockwise
